• FLOW CHART OF AUTOMATIC GRINDING UNIT

    THE PROCESS OF MANUAL GRINDING UNIT

    First the material has been fed into jaw crusger directly,Where bold pieces are converted into small pieces throw crushing. This crushed material now goes to bucket elevator and after that, it is stored into master hopper . After this process,for final grinding it is fed into ball mill where fine grinding takes place.It is the final stage for grinding now.The finished quantity-from the ball mill is stired bucket elevator. After blending the quantity is stored into cement storage silos then it goes for paccking through automatic packing and ready for despatch.

    FLOW CHART OF MANUAL GRINDING UNIT

    DOUBLE BALL MILL ARRANGEMENT

    For the purpose of continuous running and grindin, it seems much better tha Double Ball Mill Arrangement. This arrangement, not only gives continuous production but produce the cement with lesser costs . More over , this Double Ball Mill Arrangement do not require any extra equipment in comparison with Single Ball Mill Arrangement. In this arrangement , the whole unit remains running if one one of the Ball Mill stops working dueto wear & tear or some mechnical break down. It Avoides suspension and production . That is why the production becomes double with the lesser coats. It is more economical. This arrangement may be automatic as well manual. It may be handled easily manpower.

    FLOW CHART OF DOUBLE BALL MILL UNIT